Proposed Design for Corentyne River Bridge
A contractor having already been identified by both Guyana and Suriname to build the Corentyne River Bridge, Public Works Minister Juan Edghill has said the final stage is to formulate and approve the financing structure for the project.
This publication understands that these governments have jointly approached China for financing, but talks have been halted with the terms and structure in regard to financing incomplete.
Source link : http://www.bing.com/news/apiclick.aspx?ref=FexRss&aid=&tid=671e78d438ab4737a58aab9951b3b1bc&url=https%3A%2F%2Fwww.inewsguyana.com%2Fcorentyne-river-bridge-guyana-suriname-to-finalise-financing-structure-for-project-min-edghill%2F&c=7860955670239294272&mkt=en-us
Author :
Publish date : 2024-10-27 06:11:00
Copyright for syndicated content belongs to the linked Source.